OH Consultant
Templates›SWPPP & Environmental›SWPPP — Construction General Permit (CGP)
EPA / state-delegated NPDES authorities · 40 CFR 122; EPA 2022 Construction General Permit

SWPPP Template — EPA 2022 Construction General Permit Compliant

Required before any earth-disturbing activity ≥1 acre. The template covers site map development, BMP selection and installation, inspection records, corrective actions, and the Notice of Termination.

📄 36 pages· Microsoft Word (.docx)
Instant download
$295USD · one-time
36 pages · Microsoft Word (.docx)
Download link emailed the moment payment clears. Editable Microsoft Word source file, yours to reuse.
Regulatory anchor
EPA / state-delegated NPDES authorities
40 CFR 122; EPA 2022 Construction General Permit
Also references: Clean Water Act §402

When this template is required

Required for any construction project disturbing 1+ acre of land (or smaller projects that are part of a larger common plan of development ≥1 acre). The SWPPP must be developed and implemented before any earth-disturbing activity begins.

Secondary citations:Clean Water Act §402

Why this template

2022 CGP format (current)

Built to the EPA 2022 Construction General Permit, effective February 2022. Includes the new electronic NOI/NOT requirements and updated BMP guidance.

Site map required-elements checklist

CGP Part 7.2.4 requires the map to show specific features — discharge points, drainage patterns before and after major grading, control and washout locations, receiving waters within a mile downstream. The template supplies the full required-elements checklist and a revision log to work through against your own civil drawing; it does not supply a base drawing.

BMP selection guide

The CGP doesn't tell you which BMPs to use — you choose based on site conditions. The guide walks through erosion controls (mulching, blankets, etc.), sediment controls (silt fence, inlet protection, sediment basins), and stabilisation measures.

Compatible with state-delegated permits

Most states have their own CGPs (CA, TX, FL, etc.). The template is built to the EPA baseline; state variants are sold separately (see California SWPPP).

What you receive

  • SWPPP template (Word .docx) — EPA 2022 CGP format
  • Site map required-elements checklist (CGP Part 7.2.4) and site map revision log — applied to your own civil drawing; no base drawing supplied
  • BMP installation log template
  • Erosion and sediment control selection guide
  • Weekly inspection form template
  • Corrective action log
  • Construction contractor certification form
  • Notice of Intent (NOI) preparation guide
  • Notice of Termination (NOT) procedure
Instant download

How you get it

This document is written and reviewed against the standard it cites, and it is ready now. The download link is emailed as soon as your payment clears.

STEP 1
You buy
Checkout takes a minute. We capture the email address the download link should go to.
STEP 2
It arrives
The download link is emailed the moment payment clears — no waiting, no back and forth.
STEP 3
You make it yours
Editable Microsoft Word. Fill in the site-specific fields, add your logo, and issue it. Written against 40 CFR 122; EPA 2022 Construction General Permit.

Revisions included — if something about your operation changes what the document should say, reply to the delivery email and we will amend it.

Who buys this

  • Construction projects ≥1 acre of land disturbance
  • Multi-phase developments under common plan ≥1 acre
  • Highway, utility, and pipeline construction
  • Residential subdivision development
  • Commercial site development

Frequently asked

When is a SWPPP required?

Under the EPA Construction General Permit (and equivalent state-delegated permits), a SWPPP is required for any construction project disturbing 1 or more acres of land. Smaller projects (under 1 acre) that are part of a 'larger common plan of development or sale' that totals 1+ acre also need a SWPPP. The SWPPP must be developed and implemented BEFORE any earth-disturbing activity begins.

What's in a SWPPP?

2022 CGP Part 7.2 sets eleven required contents: all site operators; the stormwater team, with verification of its training and inspector qualifications; the nature of the construction activities, including the sequence, the maximum area disturbed at any one time and the pollutant-generating activity and pollutant inventory; the site map; the authorized non-stormwater discharges expected; the description, design and maintenance specifications and installation schedule for every stormwater control; inspection, maintenance and corrective action procedures; turbidity benchmark monitoring procedures where dewatering triggers them; endangered species, historic property and underground injection control documentation; the signed certification; and, once authorized, the NOI, the NeT acknowledgment letter and a copy of the permit. The template is built to that full list.

What are BMPs?

Best Management Practices — the controls used to prevent stormwater pollution. Three categories: erosion controls (preventing soil from leaving the site — mulching, blankets, vegetation); sediment controls (capturing soil that has already moved — silt fence, inlet protection, sediment basins); stabilisation measures (temporary and permanent ground cover). The template includes a BMP selection guide.

What's the difference between the EPA CGP and a state CGP?

Most US states have their own NPDES authority and issue their own Construction General Permits — California (SWRCB), Texas (TPDES), Florida (FDEP), New York (NYSDEC), etc. State CGPs are based on the EPA CGP but have state-specific requirements. The EPA CGP applies only where EPA is the NPDES permitting authority — Massachusetts and New Mexico (each except Indian country), New Hampshire, the District of Columbia, Puerto Rico and the Pacific territories, most Indian country, Lands of Exclusive Federal Jurisdiction, federal-facility work in Vermont, Delaware and Colorado, federal-operator work in Washington, and certain Oklahoma discharges outside state agency authority. CGP Appendix B is the controlling list and has been modified since the permit issued. Idaho is not on it — construction stormwater transferred to Idaho DEQ on 1 July 2021, so an Idaho site needs the IPDES construction general permit. For California, see our separate SWPPP California template; the EPA CGP template works as the starting point in non-delegated states.

Do I need to do inspections during construction?

Yes — the CGP requires regular inspections by a qualified inspector. The frequency depends on whether you're in a stabilised area or under active construction, and whether there's been a precipitation event. The template includes the inspection form; for high-volume per-site inspection records, our SWPPP Inspection Form Pack is a better fit.