OH Consultant
Wave 1 · Launch days 56-60

SWPPP & Environmental

6 OSHA-aligned templates in this family. Editable Microsoft Word, downloaded the moment you buy.

← All template families

SWPPP — Construction General Permit (CGP)

Required before any earth-disturbing activity ≥1 acre. The template covers site map development, BMP selection and installation, inspection …

EPA / state-delegated NPDES authorities · 40 CFR 122; EPA 2022 Construction General Permit
$295 USDView →

SWPPP Inspection Form Pack (Reusable Master Set)

The inspection and corrective action record set the EPA CGP requires at Part 4 (inspections) and Part 5 (corrective actions). One reusable m…

EPA / state-delegated NPDES authorities · 40 CFR 122; EPA 2022 CGP Parts 4 (Inspections) and 5 (Corrective Actions)
$149 USDView →

SWPPP — California Construction General Permit

California's CGP is stricter than the EPA baseline — Risk Level 1-3 classification, QSP/QSD personnel requirements, more frequent inspection…

California State Water Resources Control Board (SWRCB) · CA SWRCB Construction General Permit (Order WQ 2022-0057-DWQ)
$395 USDView →

SPCC Plan — Tier I + Tier II Self-Certification

Required by EPA 40 CFR 112 for facilities with >1,320 gallons aggregate above-ground oil storage capacity. Built for Tier I and Tier II self…

EPA · 40 CFR 112
$299 USDView →

SWPPP — Texas Construction (TPDES)

Texas operates its own delegated NPDES program (TPDES). Coverage comes from TCEQ under TXR150000 and the EPA Construction General Permit doe…

Texas Commission on Environmental Quality (TCEQ) · TPDES General Permit TXR150000
$295 USDView →

SWPPP — Industrial Multi-Sector General Permit (MSGP)

Industrial stormwater discharges fall under the EPA MSGP — 29 industrial sectors lettered A through AC, plus Sector AD, each with its own Pa…

EPA (or state-delegated NPDES authority) · EPA 2021 Multi-Sector General Permit (MSGP)
$395 USDView →