OH Consultant
Templates›Site-Specific Safety Plans›Site-Specific Safety Plan (SSSP) Template
OSHA · 29 CFR 1926.20(b) (Accident Prevention)

Site-Specific Safety Plan (SSSP) Template — GC Submission Ready

The project-specific safety plan your GC requires before you can mobilise. Editable Word format, customisable per project, GC-approval-ready format.

📄 28 pages· Microsoft Word (.docx)
Instant download
$295USD · one-time
28 pages · Microsoft Word (.docx)
Download link emailed the moment payment clears. Editable Microsoft Word source file, yours to reuse.
Regulatory anchor
OSHA
29 CFR 1926.20(b) (Accident Prevention)
Also references: 29 CFR 1926 General Construction · GC contract conditions

When this template is required

Required by most general contractors (GCs) as a pre-mobilisation submission. Subcontractors typically cannot begin work on a project until the GC has reviewed and approved the SSSP for the work being performed.

Secondary citations:29 CFR 1926 General Construction · GC contract conditions

Why this template

Pre-formatted for GC submission

Most GCs have a standard SSSP review checklist. The template covers every item on the major GC checklists (Skanska, Turner, Suffolk, Mortenson, etc.).

Trade-specific control sections

Generic SSSPs get rejected. The template has trade-specific sections for the work you're actually doing, with the right OSHA citations.

Customisable per project in <2 hours

The template structure means you complete project-specific sections (scope, hazards, personnel) without re-drafting the boilerplate sections each time.

Includes the submission cover sheet

GC reviewers expect a submission cover sheet with project info, signed-by line, and revision history. The template includes the cover sheet pre-formatted.

What you receive

  • Editable SSSP (Word .docx)
  • Project information and scope section
  • Site-specific hazard identification matrix
  • Trade-specific control measures (electrical, fall, excavation, etc.)
  • Emergency response and rescue procedures
  • Subcontractor coordination section
  • Training documentation and competent-person designations
  • Daily safety inspection log
  • Submission cover sheet for GC review
Instant download

How you get it

This document is written and reviewed against the standard it cites, and it is ready now. The download link is emailed as soon as your payment clears.

STEP 1
You buy
Checkout takes a minute. We capture the email address the download link should go to.
STEP 2
It arrives
The download link is emailed the moment payment clears — no waiting, no back and forth.
STEP 3
You make it yours
Editable Microsoft Word. Fill in the site-specific fields, add your logo, and issue it. Written against 29 CFR 1926.20(b) (Accident Prevention).

Revisions included — if something about your operation changes what the document should say, reply to the delivery email and we will amend it.

Who buys this

  • Subcontractors submitting to a GC before mobilising
  • Specialty trade contractors (electrical, plumbing, HVAC, roofing, etc.)
  • GCs producing the umbrella site-level SSSP
  • Federal contractor SSSPs (FAR-aligned)

Frequently asked

When does a GC require a site-specific safety plan?

Most GCs require an SSSP as part of the pre-mobilisation submission package — before any of your workers step on site. The plan is reviewed by the GC's safety team and the project's prime contractor. Subcontractors are typically barred from starting work until the plan is approved. Federal projects under EM 385-1-1 also require an SSSP-equivalent (Accident Prevention Plan).

What's the difference between an SSSP and a safety program?

A safety program is your company-wide procedures, training, and compliance framework — applies to all jobs. An SSSP is the project-specific application of that program — applies to one project. Most contractors maintain both: the company safety program (master) and a per-project SSSP (specific). This template is the SSSP; the master safety program is a different product.

Is OSHA citation 29 CFR 1926.20(b) the only requirement?

Technically, 29 CFR 1926.20(b)(1) requires every construction employer to 'initiate and maintain such programs as may be necessary to comply with this part.' The SSSP is the project-level implementation. In practice, the SSSP exists primarily because of GC contract conditions, not direct OSHA mandate. But OSHA inspectors do reference 1926.20(b) when no safety program exists at all.

Does this work for federal contractor projects?

For federal projects under EM 385-1-1 (USACE, NAVFAC, federal construction), the requirement is the Accident Prevention Plan (APP) — see our separate APP template. The SSSP and APP have overlapping content but the APP has additional federal-specific requirements (Site Safety and Health Officer designation, contracting officer review process). They're separate products.

How is this different from the Construction tier?

The generic SSSP is the universal template that works for any specialty trade. The Construction tier ($395) adds detailed trade-specific sections — electrical, plumbing, HVAC, structural, roofing, etc. — with the OSHA citations and control measures appropriate to each trade. If you work one trade, the generic is fine. If you work multiple trades or want the higher-detail tier, choose Construction.