OH Consultant
Templates›Industry-Specific Compliance Packs›Manufacturing Compliance Pack
OSHA · 29 CFR 1910 general industry standards

Manufacturing Compliance Pack

Core compliance bundle for manufacturing. 9 programs covering general industry OSHA mandates every manufacturer faces.

📄 184 pages· Microsoft Word (.docx)
Instant download
$495USD · one-time
184 pages · Microsoft Word (.docx)
Download link emailed the moment payment clears. Editable Microsoft Word source file, yours to reuse.
Regulatory anchor
OSHA
29 CFR 1910 general industry standards

When this template is required

Manufacturing faces the full general industry OSHA standards: LOTO, Machine Guarding, PIT, HazCom, Hearing Conservation, PPE, Ergonomics, Confined Space, plus industry-specific Subpart Z if applicable.

Why this template

Buying the component programs separately costs more than the pack.

Core manufacturing program suite

9 programs covering OSHA mandates every manufacturer faces. Industry-specific Subpart Z plans (Lead, Cr(VI), Cadmium etc.) overlay this baseline.

LOTO foundation

LOTO is in OSHA's Top 5 most-cited every year. The Lockout/Tagout Program ($395) is included.

Manufacturing training matrix

Shift work, contractor training, job-rotation training — manufacturing training has unique scheduling challenges addressed in the matrix.

What you receive

  • Lockout/Tagout Program
  • HazCom Program
  • Hearing Conservation Program
  • PPE Hazard Assessment + Certification
  • PIT / Forklift Training Program
  • Ergonomics Program
  • Confined Space Entry (where applicable)
  • Workplace Inspection Program
  • Accident Investigation Program
  • Manufacturing training matrix
Instant download

How you get it

This document is written and reviewed against the standard it cites, and it is ready now. The download link is emailed as soon as your payment clears.

STEP 1
You buy
Checkout takes a minute. We capture the email address the download link should go to.
STEP 2
It arrives
The download link is emailed the moment payment clears — no waiting, no back and forth.
STEP 3
You make it yours
Editable Microsoft Word. Fill in the site-specific fields, add your logo, and issue it. Written against 29 CFR 1910 general industry standards.

Revisions included — if something about your operation changes what the document should say, reply to the delivery email and we will amend it.

Who buys this

  • Discrete manufacturing (auto, appliance, electronics)
  • Process manufacturing (food, chemical, pharma)
  • Plastics and rubber
  • Metal fabrication
  • Paper and pulp
  • Textile manufacturing

Frequently asked

Does this cover Subpart Z standards?

Not directly — Subpart Z substance-specific compliance (Lead, Cr(VI), Cadmium, Beryllium, etc.) requires substance-specific plans. The Carcinogen Bundle ($2,499) covers 14 Subpart Z plans. Most manufacturers need this Manufacturing Pack + selected Subpart Z plans for their chemicals.

What about machine guarding?

OSHA 1910.212 (Machine Guarding) is a high-citation area. Pack covers machine guarding within LOTO and PPE Hazard Assessment programs.

Does this cover PSM?

PSM (1910.119) is a separate product ($699) — applies to facilities with highly hazardous chemicals above threshold quantities. Most manufacturers don't trigger PSM.

What about state-specific requirements?

Pack is federal OSHA. State-plan states (CA, WA, MI, MN, NC, VA, etc.) have parallel requirements addressed by the state-specific packs (Wave 3 Batch 3).